Contact us for a free first check-up
HotelSottoControllo

Blog How to build a hotel budget

Management control

How to build a hotel budget

A practical guide to building a hotel budget, from historical data to GOP, with the mistakes to avoid and the KPIs to track during the year.

By Alberto Genovese · · Reading time: 3 min

A professional working at a computer in an office

Every autumn the same scene repeats itself in hundreds of Italian hotels: the general manager opens last year’s file, adds a growth percentage by eye, adjusts two or three cost lines and calls the result a budget.

That is not a budget. It is an optimistic forecast dressed up as a management tool. A real budget turns a precise commercial strategy into numbers, built line by line. It tells you, month by month, how much you need to sell, at what price, at what cost, and how much is left at the end.

When to build the budget

The right time is between September and November for the following year. Before September you don’t have enough data on the current year. After November you are late: the budget must be ready and shared with your department heads before the year starts.

What you need before you start

  • At least 2-3 years of historical data, month by month: occupancy, ADR, RevPAR, revenue by department
  • Your guest segmentation: OTA, direct, groups, business, corporate
  • This year’s costs, split by department and by fixed and variable
  • Next year’s calendar: bridge holidays, local events, conferences
  • Planned works: renovations, scheduled closures

Step 1: the rooms revenue budget

This is the heart of it all. The basic formula: Rooms revenue = Available rooms × Occupancy % × ADR.

Estimate occupancy and ADR separately, by month and by segment. Never apply a uniform increase across the board: every channel has its own pricing dynamics.

Step 2: other revenue

Breakfast, restaurant, spa, meeting rooms: link each revenue line to its driver. If the rooms budget assumes 5% lower occupancy, the breakfast budget must go down accordingly.

Step 3: variable costs

Calculate them per unit, not in total: cost per occupied room, food cost as a percentage of F&B revenue (typically 25-35%), OTA commissions as a percentage of the channel’s revenue.

Step 4: departmental costs (USALI logic)

Each cost is allocated to the department that generates it. Staff cost is the heaviest line: build it month by month from your actual headcount. In an Italian hotel it is typically 30-38% of total revenue.

Step 5: overhead costs

Utilities, insurance, software fees, marketing, scheduled maintenance, rent. Plan them according to when they actually fall due each month.

Step 6: GOP and the final check

GOP = Total revenue minus departmental operating costs minus overhead costs. Divide it by available rooms and you get GOPPAR.

The most common mistakes

  • An annual budget only, with no monthly detail
  • Uniform increases (+5% on everything)
  • No segmentation by channel
  • Confusing budget and forecast
  • Building it without involving department heads
  • Not monitoring it during the year

A budget is only useful if you monitor it

Compare budget and actuals systematically: weekly on revenue, monthly on the full income statement. The question to answer every month is: where am I deviating from plan, and why?

Would you like a free consultation on your hotel?

A 30-minute call: together we go through your hotel’s 5 main KPIs and I tell you where to start.